Detour in place during closures from 9 a.m. to 2 p.m.
News Source: ADOT
The Arizona Department of Transportation advises drivers to plan for the following closures on US 60 for a bridge replacement project:
- US 60 between Superior and Miami (mileposts 227-243) will be closed from 9 a.m. to 2 p.m. Tuesday, Nov. 4, Wednesday, Nov. 5, and Thursday, Nov. 6.
Detour: Eastbound US 60 drivers use southbound State Route 177 through Winkelman to northbound SR 77. Westbound US 60 drivers use southbound SR 77 through Winkelman to northbound SR 177. Due to the roughly 75-mile length of this detour, drivers may want to consider planning travel before 9 a.m. and after 2 p.m. The detour is estimated to add an additional hour for trips between Superior and Miami.
US 60 west of Miami, near milepost 241, will continue to have alternating lane restrictions for east- and westbound travel for flood-damage repairs. Flaggers and a pilot car will assist drivers through the work zone. For additional information on the flood repair work, please visit: https://azdot.gov/news/flood-repair-work-approved-us-60-between-superior-globe-miami
Upcoming full closures:
- No lane restrictions or closures are planned on Tuesday, Nov. 11, in honor of Veterans Day.
- US 60 between Superior and Miami will be closed from 9 a.m. to 2 p.m. Wednesday, Nov. 12, and Thursday, Nov. 13. Detour in place during closures.
Schedules are subject to change based on weather and other unforeseen factors. Lane restrictions, speed reductions and a 12-foot vehicle width restriction will be in place for the duration of the project. Oversize loads may be accommodated with advance notice.
Drivers should allow extra travel time, use caution, be prepared to slow down and merge safely when approaching and traveling through all work zones.
For more information and to sign up for email alerts, please visit azdot.gov/US60QueenCreekBridgeProject
Sign Up for Text Alerts
If you would like to receive text messages from ADOT with traffic alerts for the US 60, Queen Creek and Waterfall Canyon Bridges Replacement project, please update your subscriber preferences HERE.
- Under Subscription Type, select SMS/Text Message.
- Enter your wireless number (no dashes) and click Submit.
- A new page will appear with a list of corridors enabled for text messages.
- Under Southeast District Projects, select US 60: Queen Creek and Waterfall Canyon Bridge Projects to receive text messages and click Submit.








