The Arizona Department of Transportation (ADOT) is requesting public comments on the current study phase of its North-South Segment 2 Study, an engineering and environmental study examining the North-South Corridor (State Route 505) from Arizona Farms Road to Interstate 10. The study spans approximately 31 miles and extends from I-10 near Eloy to Florence.

For those who missed the recent public meetings, the public meeting presentation, display boards and fact sheet can be viewed on the study website.
The public can submit comments through multiple channels until the September 8 deadline:
- Take the online survey at https://bit.ly/NSSegment2survey
- Call the Bilingual Project Information Line at 602.952.5700
- Email the project team at [email protected]
- Mail: ADOT North-South Segment 2 c/o HDR, Inc. 20 E. Thomas Road, Suite 2500 Phoenix, AZ 85012
The project aims to improve the transportation network to accommodate existing and future populations, improve access and regional mobility, provide an alternative to I-10, improve north-to-south connectivity, and integrate the region’s transportation network.
